The cloud move that
does not stall the business.
Cloud strategy, architecture, and migration across AWS, Azure, and GCP. Planned so the business keeps running while the infrastructure changes underneath it.
Most cloud migrations fail before the first server moves.
The failure point in most cloud migrations is not the technology. It is the absence of a strategy before the work starts. Teams move workloads without understanding dependencies, choose the wrong provider or architecture for the actual workload requirements, and discover the real complexity only after the migration is underway. At that point, the cost of changing direction is high and the pressure to push through regardless is higher. A migration plan that accounts for the full picture before a single workload moves is what separates a successful cloud transition from a recovery project.
70%
of cloud migrations run over budget or over schedule, most often because the strategy was defined after the migration had already started
$2.66M
average cost of a failed cloud migration for mid-size enterprises, not counting the operational disruption and recovery time that follows
4x
more likely to see performance improvements when cloud migration is preceded by a documented architecture strategy rather than a lift-and-shift approach
Cloud that fits the workload.
Strategy, architecture, and migration.
Cloud Strategy & Roadmap
Provider selection, architecture decisions, workload prioritization, and a phased migration roadmap built around your business timeline and risk tolerance. The output is a plan the business can execute against, not a slide deck.
Cloud Architecture Design
Landing zone design, network topology, identity and access structure, security baseline, and service selection across AWS, Azure, and GCP. Designed for the workloads you are actually running, not a generic reference architecture.
Workload Migration
Lift-and-shift, re-platform, and re-architect migrations executed with minimal disruption. Database migrations, application refactoring, data transfer, cutover planning, and rollback procedures all accounted for before the work starts.
Hybrid & Multi-Cloud Connectivity
Architecture and implementation for environments that span on-premises infrastructure and one or more cloud providers. Connectivity, routing, identity federation, and data synchronization across the full environment.
Strategy first. Migration second.
No workload moves without a plan behind it.
Map the environment before anything moves.
Discovery & Assessment
We map your current infrastructure, application dependencies, data flows, compliance requirements, and team capabilities. The assessment tells us what can move as-is, what needs to change, and what the migration will actually cost in time and effort.
Design the target state before the first workload moves.
Strategy & Architecture
Provider selection or multi-cloud structure, target architecture design, landing zone build, security baseline, and a phased migration sequence with clear milestones. Nothing moves until the plan is signed off.
Migrate in phases with rollback at every stage.
Migration Execution
Workloads migrate in priority order with rollback procedures in place for each phase. Testing gates between phases confirm that what moved is working before the next phase starts. The business stays operational throughout.
Tune, document, and hand over a cloud the team understands.
Stabilization & Handover
Post-migration performance tuning, cost baseline establishment, monitoring setup, and runbook documentation. We hand over a cloud environment the team understands and can operate, not one that requires ongoing help to manage.
Cloud migrations that land where they were supposed to.
Planned, executed, and handed over.
Migrations planned to the last dependency.
We map every application dependency, data flow, and integration point before a workload moves. The migrations that fail are the ones where something unexpected surfaces mid-execution. Our discovery process is designed to find those surprises before they become problems.
Architecture matched to the workload.
We do not apply a default architecture to every engagement. Provider choice, service selection, network design, and scaling approach are all driven by what the workload actually requires. The result is a cloud environment that performs and costs what it should.
Costs controlled from day one.
Cloud cost overruns happen when architecture decisions are made without cost awareness. We design with cost in mind from the start — right-sizing, reserved capacity planning, and tagging strategy are part of the architecture, not an afterthought added when the bill arrives.
Migrations planned to the last dependency.
We map every application dependency, data flow, and integration point before a workload moves. The migrations that fail are the ones where something unexpected surfaces mid-execution. Our discovery process is designed to find those surprises before they become problems.
Architecture matched to the workload.
We do not apply a default architecture to every engagement. Provider choice, service selection, network design, and scaling approach are all driven by what the workload actually requires. The result is a cloud environment that performs and costs what it should.
Costs controlled from day one.
Cloud cost overruns happen when architecture decisions are made without cost awareness. We design with cost in mind from the start — right-sizing, reserved capacity planning, and tagging strategy are part of the architecture, not an afterthought added when the bill arrives.
We tried to move to AWS twice before and both times the project stalled because no one could agree on the architecture. Amorisoft came in, ran a proper discovery, and gave us a plan that the engineering team, the ops team, and the CFO all signed off on. The migration completed in four months with zero unplanned downtime.
CTO
Insurance Technology Platform, Dubai, UAE
We tried to move to AWS twice before and both times the project stalled because no one could agree on the architecture. Amorisoft came in, ran a proper discovery, and gave us a plan that the engineering team, the ops team, and the CFO all signed off on. The migration completed in four months with zero unplanned downtime.
CTO
Insurance Technology Platform, Dubai, UAE
Have a cloud move to plan or a migration that needs a second look?
Bring the brief. One conversation is enough to know whether we are the right fit.
